Hi Guys,
Hopefully this is not a repeat, but I havent found a suitable answer on searching.
I have a Pulsar 2 connected to a Roland VM3100 Digital Mixer via both SP/DIF and ADAT. I have Cubase/SL and use the VM3100 as the A/D for Guitar, Mics etc.
Two Questions:
1) Should the Pulsar 2 be the master or slave clock source ?
2) Is it better to use the ADAT or SP/DIF for clock sync'ing.
Thanks
Chris